Project information
Application of the ENTSO-e cost-benefit analysis method to Conso II pumped-hydro storage
September 2024 - September 2024
Funding entity Iberdrola Generación España, S.A.U
The aim of this work is the application of the ENTSO-e cost-benefit analysis method to Conso II pumped-hydro storage.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
IberdrolaConsoIIENTSOE